Voltage Drop & Wire Size Calculator

One page, both questions: how much voltage will this run lose, and what gauge should it actually be? Enter load, voltage and one-way distance, and get the drop for any AWG plus the recommended gauge that satisfies both the NEC ampacity table and a 3% drop limit.

The math is the standard NEC Chapter 9 method: VD = 2 × K × I × L ÷ circular mils for single-phase (K = 12.9 copper, 21.2 aluminum, Ω·cmil/ft). Ampacity checks use NEC Table 310.16 at 75 °C (copper: 12 AWG 25 A, 10 AWG 35 A, 8 AWG 50 A, 6 AWG 65 A, 4 AWG 85 A; aluminum runs roughly two sizes larger for the same amps). The 3% / 5% figures are the NEC’s informational-note guidance for reasonable efficiency — widely treated as design limits, not letter-of-law mandates. Breaker and termination rules (including the 14/12/10 AWG overcurrent caps of 240.4(D)) still apply on top.

Voltage drop & recommended gauge
—
Advertisement
Clear Math — the answer, explained like a friend wouldPercentages, fractions, grades & everyday math, step by step. No signup, ever →

How it works

Voltage drop grows with current and distance and shrinks with conductor cross-section. The recommendation works the shelf in order: starting from the smallest gauge whose 75 °C ampacity covers the load, it tests each size against your drop limit and returns the first that passes both. That is why long runs upsized for drop are normal — a 100 ft run at 16 A needs 8 AWG to hold 3% at 120 V even though 12 AWG carries the amps easily. Distance hurts at 120 V four times as much as at 240 V for the same wattage (half the amps, half the percentage) — the quiet argument for 240 V circuits to outbuildings.

Design calculator using the standard K-constant method and NEC Table 310.16 (75 °C) — actual installations must also satisfy termination temperature limits, conduit fill, ambient correction, the small-conductor overcurrent rules, and your AHJ. Three-phase runs use a √3 factor in place of 2; this tool models single-phase, the residential case. When a calculation decides a real install, an electrician verifies it.

Formula & worked example

Formula: Single-phase voltage drop VD = 2 × K × I × L ÷ CM, with K = 12.9 (copper) or 21.2 (aluminum) Ω·cmil/ft, I in amps, L one-way feet, CM the conductor’s circular mils (12 AWG 6,530; 10 AWG 10,380; 8 AWG 16,510; 6 AWG 26,240). Percent = VD ÷ circuit volts × 100. Recommended gauge = smallest size passing both NEC Table 310.16 (75 °C) ampacity and your drop limit.

Worked example: 16 A, 120 V, 100 ft on 12 AWG copper: VD = 6.32 V = 5.27% — and the recommended gauge for a 3% limit is 8 AWG.

When to use this

How to use it, step by step

  1. Enter the load’s actual running amps (nameplate, not breaker size).
  2. Pick the circuit voltage and measure the one-way run honestly — conduit path, not straight-line.
  3. Check your intended gauge; read the drop volts and percent.
  4. Read the recommended gauge for your chosen limit — that is the buy decision.

What the inputs mean

InputWhat it isTypical values
Load ampsRunning current of the load16 A space-heater circuit; 32 A EV charger at 240 V
One-way distancePanel to load along the actual route, feet50–150 ft outbuilding runs
GaugeAWG size to test; recommendation searches all sizes12 AWG branch standard; 6–8 AWG long runs
Material / limitCopper vs aluminum constants; drop ceiling for the recommendationCu K 12.9; Al K 21.2; limit 3% typical

Another worked example

A 32 A, 240 V load at 150 ft: on 8 AWG copper the drop is 7.50 V = 3.13% — close, but over a strict 3% line, so the recommendation is 6 AWG. Relax the limit to the 5% feeder-plus-branch guidance and 10 AWG stands instead (35 A ampacity, 4.97% drop). Same run, answers two sizes apart — the limit is the decision, the math just enforces it.

Frequently asked questions

How much voltage drop on 100 ft of 12 AWG at 16 amps, 120 V?

VD = 2 × 12.9 × 16 × 100 ÷ 6,530 cmil = 6.32 V, which is 5.27% — over the 3% guidance. The amps are fine on 12 AWG; the distance is the problem. Holding 3% on this run takes 8 AWG. This is the single most common surprise in garage and outbuilding wiring.

What gauge do I need for 32 amps at 240 V over 150 ft?

On 8 AWG the drop is 7.50 V = 3.13% — just over a 3% limit — so the recommendation steps up to 6 AWG. At a 5% limit, even 10 AWG passes: its ampacity (35 A) covers the load and its drop is 4.97%, so 10 AWG is the recommended size there. The limit you choose is a design decision: motors and heaters tolerate 5%; electronics and long-term efficiency argue for 3%.

Why does 240 V halve the problem twice?

Percentage drop depends on amps and volts together. The same 3,840 W load draws 32 A at 120 V but 16 A at 240 V, and the percentage is computed against twice the voltage: the drop percentage falls to a quarter. Whenever a load can be served at 240 V over distance — well pumps, shop tools, EV chargers — it should be.

Copper or aluminum for a long feeder?

Aluminum’s K is 21.2 against copper’s 12.9, so an aluminum conductor needs about 64% more circular mils — roughly two AWG sizes — for the same drop, and its ampacity per size is lower. It is also much cheaper per amp-foot at feeder sizes, which is why service feeders are aluminum and branch circuits are copper. Terminations must be AL-rated and torqued to spec; that is an installer discipline item, not a math one.

Is 3% a code requirement?

It is an informational note in the NEC (210.19 and 215.2) recommending design so that branch-circuit drop stays under 3% and feeder-plus-branch under 5% "for reasonable efficiency of operation." Many specs and inspectors treat it as a limit; the enforceable code governs ampacity and protection. Design to 3% on branch runs and nobody argues.

What happens if I ignore voltage drop?

Motors run hot and start hard (a pump at 105 V works measurably harder), heaters under-deliver (output falls with the square of voltage: 5% drop ≈ 10% less heat), lights dim on load steps, and electronics complain. The wire itself also wastes the dropped energy as heat along the run — you pay for volts your tools never see.

How do I handle a run longer than the table likes?

Upsize the conductor (this tool’s recommendation), raise the voltage (240 V or a transformer), shorten the route, split the load across two circuits, or move the source (a subpanel fed by a properly sized feeder, with drops budgeted in two legs that must sum under your limit). Real designs often combine the first two.